Position: Home » Industry Info » Maintenance of baggage packing machine

Maintenance of baggage packing machine

The daily maintenance of luggage wrapping machine equipment must perform several processes. It is the cleaning, fastening, adjustment, lubrication and corrosion protection of the luggage wrapping machine. In the daily production process, machine maintenance personnel should strictly perform maintenance work within the specified time according to the maintenance manual and maintenance procedures of the luggage wrapping machine, reduce the wear rate of parts, eliminate hidden troubles, and expand the scope of services. The life of the machine.

The maintenance of the luggage wrapping machine includes routine maintenance, regular maintenance and other maintenance. Regular maintenance can be divided into three categories: first level maintenance, second level maintenance and third level maintenance. Other maintenance can be divided into two categories: quarterly maintenance and out of service maintenance. The following article will introduce the specific process and preventive measures of the maintenance work of the luggage wrapping machine equipment.

Routine maintenance of the luggage wrapping machine focuses on cleaning, lubricating, checking and tightening. Routine maintenance should be carried out during and after machine operation.
Primary maintenance is carried out on the basis of regular maintenance. The key tasks are lubrication, tightening and inspection of related parts and cleaning.
The focus of secondary maintenance is inspection and adjustment. Check the engine, clutch, transmission, transmission components, steering and brake components.
The three-level maintenance focuses on detecting, adjusting, troubleshooting and balancing the degree of wear of each component. Diagnose and check the components that affect the performance of the baggage packaging machine and the components with fault symptoms to complete component replacement, adjustment and troubleshooting.

Seasonal maintenance refers to the inspection and inspection of the power system (engine), conveying system (screw and belt conveyor), air pressure system (checking the lubrication and sealing of the air compressor) and control system (inspection and maintenance) of the luggage wrapping machine. service. The installation of the UTE electromechanical control cabinet should be completed under the guidance of UTE after-sales engineers before the end of summer and winter each year).

Maintenance of baggage packing machine